Working with clients Waterford, Wedgwood, Royal Doulton (WWRD) the practice provided master planning services and gained planning approval for the ambitious redevelopment of their 281 acre estate at Barlaston. The site is designated greenbelt and the successful planning application was the result of extensive consultation with the Local Planning Authority, English Nature, British Waterways, Staffordshire Co-Council and the West Midlands Regional Growth Fund.
The estate's redevelopment proposals include a state of the art refurbished factory, visitor's attraction "The World of Wedgwood", new Wedgwood Museum gallery, Restaurant, Retail and Wedgwood tea room, a marina, new Corporate Headquarters and manufacturing. The proposals being part funded by a housing development consisting of 209 houses.
In addition to acting as masterplanner, the practice was also appointed as architects to deliver the scheme at detailed scales. The World of Wedgwood opened in the summer of 2015.
The Master’s House, St John’s Hosptial, Lichfield.
Assessment of historic fabric to ensure a secure understanding of the historic fabric, and how appropriate breathable insulat ions and secondary glazing could be sympathetically installed.
Solution: A breathable IWI Sheep Wool Insulation and lime mortar on wood wool. Sympathetic interiors following the completed installation of secondary glazing, breathable insulation, lime plaster and breathable decorations. The property has reduced its winter energy costs and enjoys a more comfortable thermal environment.



Arca, Birmingham
CAT A fitout Office project located in Birmingham City Centre which achieved Excellent under the BREEAM UK Refurbishment and Fitout criteria. Careful design decisions chosen alongside consulting with BREEAM Professionals allowed us to achieve the required Excellent BREEAM Rating and achieve a modern, flexible and focus driven working space interior fitout.
Our design teams can identify when thermal modelling software, daylight assessment or building fabric analysis is required for U-value calculation or other aspects of building performance.



St Peters Church, Maney Hill.
Works undertaken to provide solar panels to the south facing pitch of the nave, to reduce operational running costs.


The role of a building and site in supporting and enhancing ecosystems and native species.
The greenhouse gas emissions from the lifecycle of building materials, including extraction, manufacturing, transport, construction, maintenance, and disposal. The conservation team has an especially thorough understanding of how different building materials respond to climate and weather in the short and long term. This expertise helps us to avoid costly errors when specifying building materials.
The greenhouse gas emissions from energy consumption required to operate a building (e.g., heating, cooling, lighting, appliances). The engagement of Services and Energy consultants from the feasibility stage onwards helps our clients to explore lifetime energy consumption and improve efficiency.
The amount of water consumed during a building's operation and its broader impact on water resources.
The impact of building design and materials on occupants' physical and mental health. We guide clients through all their options when it comes to occupant well being and technology.