Mellstock is a new family home which has been built on a garden windfall site located in a village near Gloucester. The timber framed self-build project was completed in 2016.
The dwelling’s exterior is dominated by the horizontal western red cedar timber cladding to the first floor. Punctuated windows form feature areas, which have been set back with narrow vertical cladding infills creating relief to the façade. The lower level of the dwelling is formed of a muted dark render together with large areas of glazing around a courtyard.

At First floor, a large cantilevered overhanging roof provides a sheltered balcony to the main bedroom, allowing views of the countryside. Internally, a large central roof light fills the centre of the upper floor with light.
Externally the house was built at a lowered ground level to enable a full two storey dwelling while minimising the impact on neighbours.
The Master’s House, St John’s Hosptial, Lichfield.
Assessment of historic fabric to ensure a secure understanding of the historic fabric, and how appropriate breathable insulat ions and secondary glazing could be sympathetically installed.
Solution: A breathable IWI Sheep Wool Insulation and lime mortar on wood wool. Sympathetic interiors following the completed installation of secondary glazing, breathable insulation, lime plaster and breathable decorations. The property has reduced its winter energy costs and enjoys a more comfortable thermal environment.



Arca, Birmingham
CAT A fitout Office project located in Birmingham City Centre which achieved Excellent under the BREEAM UK Refurbishment and Fitout criteria. Careful design decisions chosen alongside consulting with BREEAM Professionals allowed us to achieve the required Excellent BREEAM Rating and achieve a modern, flexible and focus driven working space interior fitout.
Our design teams can identify when thermal modelling software, daylight assessment or building fabric analysis is required for U-value calculation or other aspects of building performance.



St Peters Church, Maney Hill.
Works undertaken to provide solar panels to the south facing pitch of the nave, to reduce operational running costs.


The role of a building and site in supporting and enhancing ecosystems and native species.
The greenhouse gas emissions from the lifecycle of building materials, including extraction, manufacturing, transport, construction, maintenance, and disposal. The conservation team has an especially thorough understanding of how different building materials respond to climate and weather in the short and long term. This expertise helps us to avoid costly errors when specifying building materials.
The greenhouse gas emissions from energy consumption required to operate a building (e.g., heating, cooling, lighting, appliances). The engagement of Services and Energy consultants from the feasibility stage onwards helps our clients to explore lifetime energy consumption and improve efficiency.
The amount of water consumed during a building's operation and its broader impact on water resources.
The impact of building design and materials on occupants' physical and mental health. We guide clients through all their options when it comes to occupant well being and technology.