
The site of a former garage on the upper part of Cleeve Hill, outside of Cheltenham, benefits from spectacular views over Cheltenham Racecourse, the Vale of Gloucester and the Malvern Hills beyond. The practice was appointed to design a scheme for the redevelopment of the site.
The steeply sloping topography of the site demanded a split level solution, and the bold contemporary design allows for the provision of external terraces and balconies at each of the three floor levels to take maximum advantage of the unparalleled views.
The development comprises two pairs of houses, with the dwellings each offering different floor layouts and levels of accommodation.
The geology of the site posed significant challenges on an engineering level, with one of the pairs of dwellings located on a slip-plane on the side of the hill – the substructure to these two plots therefore incorporates deep contiguous piling to the retaining walls and a piled lower floor structure.
The dwellings have been constructed to a very high specification, each incorporating a passenger lift, state of the art kitchen and sophisticated smart electrical/entertainment systems and services installations.
The Master’s House, St John’s Hosptial, Lichfield.
Assessment of historic fabric to ensure a secure understanding of the historic fabric, and how appropriate breathable insulat ions and secondary glazing could be sympathetically installed.
Solution: A breathable IWI Sheep Wool Insulation and lime mortar on wood wool. Sympathetic interiors following the completed installation of secondary glazing, breathable insulation, lime plaster and breathable decorations. The property has reduced its winter energy costs and enjoys a more comfortable thermal environment.



Arca, Birmingham
CAT A fitout Office project located in Birmingham City Centre which achieved Excellent under the BREEAM UK Refurbishment and Fitout criteria. Careful design decisions chosen alongside consulting with BREEAM Professionals allowed us to achieve the required Excellent BREEAM Rating and achieve a modern, flexible and focus driven working space interior fitout.
Our design teams can identify when thermal modelling software, daylight assessment or building fabric analysis is required for U-value calculation or other aspects of building performance.



St Peters Church, Maney Hill.
Works undertaken to provide solar panels to the south facing pitch of the nave, to reduce operational running costs.


The role of a building and site in supporting and enhancing ecosystems and native species.
The greenhouse gas emissions from the lifecycle of building materials, including extraction, manufacturing, transport, construction, maintenance, and disposal. The conservation team has an especially thorough understanding of how different building materials respond to climate and weather in the short and long term. This expertise helps us to avoid costly errors when specifying building materials.
The greenhouse gas emissions from energy consumption required to operate a building (e.g., heating, cooling, lighting, appliances). The engagement of Services and Energy consultants from the feasibility stage onwards helps our clients to explore lifetime energy consumption and improve efficiency.
The amount of water consumed during a building's operation and its broader impact on water resources.
The impact of building design and materials on occupants' physical and mental health. We guide clients through all their options when it comes to occupant well being and technology.